Wing Flaps Installed
Time to get the wings completed and out of the hangar! Last step before the go on the shelf for a while was the flaps, so it was time to get it done!
An RV-8 Build Log
Time to get the wings completed and out of the hangar! Last step before the go on the shelf for a while was the flaps, so it was time to get it done!
After finally getting back to RV-8 work, Sam and I got some good momentum back finishing closeout of the left wing. It’s nice to be back!
I need to finalize the left wing interior before I can close out the skin. This post walks through the steps completed to get there.
In an epic 24 hours, Sam and I successfully cranked through the right outboard bottom skin. Read on for the details!
A few things need to get done before riveting on the outboard bottom skins. In this post I’ll recap the work getting prepped.
November is gotten off to a better start with the some wiring activities and more bottom skin riveting. Lots of help from Sam, plus the experience from the right wing made the second time around a lot easier.
It was a slow month for RV-8 progress, but there was definitely some progress. Catch up in this quick recap post of October going’s on.
It’s nice to get back to some progress on the RV-8, and in this post I’ll re-cap September activities moving towards a closed out wing!
At long last, the last of the Wing projects is complete (for now)! With a couple good sessions and a bunch of different helpers I was able to the bell cranks complete, and the ailerons mounted! Check out the post for more…
These past few sessions have been pretty special, with my Dad getting involved for the first time! I also had a chance to build with a young friend who is super into all things aviation. Read on for the details…