Pitot Tube Fitting and Test Install

Build Crew:

Hours:

Sam
1.5

Catch up Post! Long story short, on December 9th, I had an interesting incident with the Velocity and I diverted my attention to that aircraft for the past few months (different post on that coming at some point). I’m finally getting back to RV-8 work so catching up on some work I did back in December! The pitot tube plumbing and test fit has been complete and left wing is ready to be closed up! Thanks to Sam for helping me get the wires pulled! Below are the photos from the work with inline descriptions. 

With the pitot plumbing complete, the bottom skin is ready to get closed up! Until then, Happy Building!

2 comments

Leave a comment