Quick session so quick post. Got to sneak away for an hour and installed one of the two anti-hangup brackets in the right tank. This is required in the invert tank to protect against the flop tube getting stuck. Pretty simple shaping of a strip of 0.025″ aluminum and eyeballing the drilling. I got to use my pneumatic blind riveter for one of the rivets, but unfortunately the geometry didn’t work for the other one so had to use the lowly manual squeezer ;)! Below are some pictures of the build. Really just keeping myself busy until the big baffle seal on Saturday. Happy Building!!